Handoko, Andhika (2007) PT Schneider electric manufacturing batam and new warehouse design with lean warehousing approach. Bachelor thesis, Petra Christian University.
Full text not available from this repository.Official URL: http://dewey.petra.ac.id/jiunkpe_dg_10497.html
Abstract
This paper describes the warehouse project moving PT. Schneider ElectricManufacturing Batam from lot 13A to lot 04 and lot 208. The intentions of thepaper are to knowing disadvantages and advantages after warehouse projectmoving has done that can reduce space and balance all activities process inwarehouse. The effort for identifying the company and it has a significant impactso that decrease cost, reduce space and avoid of discrepancy.
Item Type: | Thesis (Bachelor) |
---|---|
Uncontrolled Keywords: | jit, fmr and takt time |
Subjects: | UNSPECIFIED |
Divisions: | UNSPECIFIED |
Depositing User: | Admin |
Date Deposited: | 23 Mar 2011 18:48 |
Last Modified: | 31 Mar 2011 20:18 |
URI: | https://repository.petra.ac.id/id/eprint/481 |
Actions (login required)
View Item |