Logo

Measure busbar and power assy time for low voltage line at PT. Schneider Electric Indonesia

Permana, Hendra (2007) Measure busbar and power assy time for low voltage line at PT. Schneider Electric Indonesia. Bachelor thesis, Petra Christian University.

Full text not available from this repository.

Abstract

Schneider Electric Indonesia Ltd .is implementing Lean Sigma concept as it?s production system for continuous improvement. With these concept, PT. SEI wants to satisty customer with a good quality product, on time delivery, and has an efficient line production to increase the profit. Right now Low Voltage (LV) line production has an extreme variation due to the variation in customer?s demand for Blokset panel. It makes the line leader difficult to estimate the number of operator in each workstation. The author is focusing in busbar and power connection assy only due to the time limitation. The goal of this final project is to calculate the appropriate number of operator for busbar and cable power connection assy and finally it will improve LV line productivity.

Item Type: Thesis (Bachelor)
Uncontrolled Keywords: lean manufacturing, red green analysis
Subjects: UNSPECIFIED
Divisions: UNSPECIFIED
Depositing User: Admin
Date Deposited: 23 Mar 2011 18:48
Last Modified: 31 Mar 2011 20:54
URI: https://repository.petra.ac.id/id/eprint/103

Actions (login required)

View Item