Anggraeni, Ratna (2008) Orchid mechanical parts a pilot project for tooling monitoring system at PT Schneider Electric manufacturing Batam. Bachelor thesis, Petra Christian University.
Full text not available from this repository.Abstract
Department Industrialization Parts PT Schneider Electric Manufacturing Batam, in this time in pursuance of tooling renewal and repair inwhich result from this tooling renewal and repair will very affecting to thecontinuity of company production. Therefore this Final Assignmentcontain about making ofrepair and renewal tool scheduleespecially inOrchid product group by using Microsoft Excel software. The purposeof making this programisto facilitate making ofschedule so that repair and renewal toolscan be watched eminently and finally production process can walk at ease. This program isalso expected can analyze is the cost of depreciationif Industrialization Parts engineer is getting late to make repair or renewal tools.Use of this program issimple enough, that is input material master, name of component along with its part number, PO quantity, tool life in shot, amount of workday during one months, budget, and forecast quantity. Automatically, program will makescheduling and countenumeration of depreciation.
Item Type: | Thesis (Bachelor) |
---|---|
Uncontrolled Keywords: | alert indicator, renewal, repair |
Subjects: | UNSPECIFIED |
Divisions: | UNSPECIFIED |
Depositing User: | Admin |
Date Deposited: | 23 Mar 2011 18:48 |
Last Modified: | 31 Mar 2011 18:35 |
URI: | https://repository.petra.ac.id/id/eprint/1577 |
Actions (login required)
View Item |