Chandra, Herry Pintardi and Indarto, and Wiguna, I Putu Artama and Kaming, Peter F. (2012) Identification Variables of Stakeholder Salience on Construction Project. International Journal of Academic Research, 4 (2). pp. 46-50. ISSN 2075-4124
| PDF Download (185Kb) | Preview |
Abstract
Stakeholders are a major source of uncertainty in construction project. Successful construction project management can be carried out only when the responsible managers take into account the potential influence of the project’s stakeholders. This paper concentrates on identification variables of stakeholder salience that influence in construction project and starting to address these variables into a small number of factors that adequately represent the original set of variables.To complete this research objective, literature review, interview, and questionnaire survey were used in this study. The data obtain from a questionnaire survey to 197 respondents were analysis by using factor analysis. The results of this research show that from 16 stakeholder variables can be defined into four number of representative factors. The first factor for stakeholder empowerment are considered and more important and have greater influence on construction project including stakeholder engagemen process, stakeholder intrinsic motivation, stakeholder opportunity to perform,stakeholder ability to perform, and task behaviors. Keywords: Stakeholder Salience, Construction Project
Item Type: | Article |
---|---|
Subjects: | Q Science > Q Science (General) T Technology > T Technology (General) |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering Department |
Depositing User: | Dr. Ir. Herry Pintardi Chandra, S.E., M.M, M.T. |
Date Deposited: | 01 Apr 2014 12:39 |
Last Modified: | 18 Jul 2019 03:59 |
URI: | https://repository.petra.ac.id/id/eprint/16515 |
Actions (login required)
View Item |