Logo

Desigining an Integrated Product and Process Layout Using a Simulation: The Case of Plastic Bag Company

TANUTOMO, NAOMI MELINA and Octavia, Tanti (2016) Desigining an Integrated Product and Process Layout Using a Simulation: The Case of Plastic Bag Company. International Journal of Industrial Research and Applied Engineering, 1 (1). pp. 15-24. ISSN 2407-7259

[img] PDF
Download (521Kb)
    [img]
    Preview
    PDF (cek plagiasi)
    Download (3028Kb) | Preview
      [img]
      Preview
      PDF (peerreview)
      Download (1007Kb) | Preview

        Abstract

        This paper proposed an integrated product and process layout for optimizing process plant layout using a simulation approach. The proposed layout was compared to the existing layout in terms of the average work-in-process and the average waiting time of work-in-process. Currently, the plastic bag company uses process layout for its production facility layout and the activity of material movement is conducted in a batch fashion. In the proposed layout, product layout was utilized for two of six processes and process layout was utilized for the rest. Product layout changed material movement from batch into one piece flow with material handling conveyor. Software ProModel 7.0 was run in 1 year run-time with 10 replications. The simulation results show that the proposed layout reduces the average work-in-process and work-in-process waiting time in warehouse inspection by 97.92% and 96.82%, respectively. The proposed layout eliminates 47.42 minutes of the average waiting time in welding cutting temporary storage area.

        Item Type: Article
        Additional Information: Jurnal Internasional baru belum terindex jadi diberikan nilai poin dan deklarasi sesuai dengan jurnal nasional terakreditasi
        Uncontrolled Keywords: Facility Layout, Process Layout, Product Layout, Simulation
        Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
        Divisions: Faculty of Industrial Technology > Industrial Engineering Department
        Depositing User: Admin
        Date Deposited: 21 Oct 2016 19:11
        Last Modified: 30 Nov 2020 04:37
        URI: https://repository.petra.ac.id/id/eprint/18212

        Actions (login required)

        View Item