Pratama, Samuel Evan and Panjaitan, Togar W S Penyusunan Hazard Identification Risk Assessment and Risk Control pada Perusahaan Pipa Baja. In: Seminar Nasional Teknik Industri Menuju Era Green Governance, Green Industry , 8 November 2014, UK Petra, Surabaya . (Unpublished)
SNTI_32-New.pdf
Download (272kB)
Abstract
PT. X, is a local company that manufacturer of wide range of steel pipes/tubes and
other related products to meet specifications. PT. X wanted to compose Hazard Identification
Risk Assessment and Risk Control (HIRARC) to fulfill one clause of the application of OHSAS
18001:2007. In Preparation of HIRARC, consist of 3 stages: hazard identification, risk
assessment, and risk control. Hazard identification performed based on interviews with the
workers, the observations at the site, and the historical data of accidents of PT. X. The result of
the risk assessment shows that there are some activities with potential hazards. There are 61%
moderate risk and 5% high risk. Risk control will be performed on activities with moderate risk,
high risk, and extreme risk category.
| Item Type: | Conference or Workshop Item (Speech) |
|---|---|
| Subjects: | T Technology > T Technology (General) |
| Divisions: | Faculty of Industrial Technology > Industrial Engineering Department |
| Depositing User: | mr. Togar W. S. Panjaitan |
| Date Deposited: | 17 Sep 2015 05:55 |
| Last Modified: | 17 Sep 2015 05:55 |
| URI: | https://repository.petra.ac.id/id/eprint/17025 |
