Ongkowijoyo, Citra S. and Gurmu, Argaw and Andi (2021) Investigating risk of bridge construction project: exploring Suramadu strait-crossing cable-stayed bridge in Indonesia. [UNSPECIFIED]
Publikasi1_02016_6862.pdf
Download (576kB)
Publikasi4_02016_6862.pdf
Download (576kB)
Abstract
Purpose � The complexities in strait-crossing cable-stayed bridge project are increasing the risks. This
study aims to identify and analyze the significant and worth-considered construction risks of the first, biggest
and longest spanned strait-crossing bridge project in Indonesia.
Design/methodology/approach � As many as 32 risk events were identified and determined as the
risks that exist and can be represented in the Suramadu bridge project context. Data was collected through a
design-based questionnaire disseminated to experts involved in the project as well as semi-formal interviews.
Several quantitative methods were applied to analyze the significant risks, such as relative importance index,
Spearman�s rank correlation test and Mann�Whitney U test.
Findings � The analyses reveal that �unexpected natural behavior� confirmed by both contractor and
consultant parties is the most significant and crucial risk event. Another risk event found to be significant is
the �delayed payment.� On the other hand, it is also found that several risks within the legal category are
found to be less significant compared to other major risk events.
Research limitations/implications � The results of the present research should be interpreted in the
context of several limitations. Given these possible concerns regarding the generalizability of the findings,
along with the relatively low rate of participants in the current research, additional studies are needed to
provide a more complete picture of stakeholder perceptions who are involved directly in the construction
environment as well as to identify more construction risks specifically in the large-scale bridge project.
Practical implications � This study has provided fundamental contributions to the body of knowledge
and practical implication to promote and assist decision-makers toward developing a comprehensive risk
assessment of a large-scale bridge project.
Originality/value � The analyses of outcomes and discussion, as well as the findings of this research,
have shed light on the construction risks understanding, which contributes to delivering a theoretical
framework for achieving large-scale bridge project success
| Item Type: | UNSPECIFIED |
|---|---|
| Uncontrolled Keywords: | Project management, Infrastructure, Risk analysis, Megaproject, Construction project, Suramadu bridge |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering Department |
| Depositing User: | Admin |
| Date Deposited: | 06 Jan 2021 15:28 |
| Last Modified: | 30 Jul 2021 09:51 |
| URI: | https://repository.petra.ac.id/id/eprint/20267 |