Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam

Wijaya, Ferdianto (2008) Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam. Other thesis, Petra Christian University.

Full text not available from this repository. (Request a copy)

Abstract

This final project is focused on kanban implementation to increase labor productivity at PT Schneider Electric Manufacturing Batam. This final project is divided into four steps: design kanban, do implementation, make analysis and the last do improvement based on analysis that has done. The result from kanban implementation is success to increase labor productivity. It is increased around 14 % after kanban implementation.

Item Type: Thesis (Other)
Uncontrolled Keywords: kanban implementation, labor productivity
Depositing User: Admin
Date Deposited: 23 Mar 2011 11:48
Last Modified: 31 Mar 2011 13:17
URI: https://repository.petra.ac.id/id/eprint/478

Actions (login required)

View Item
View Item