Limanto, Sentosa and Hadi Kusuma, Jonatan and Siswanto, Stephen H. and Wijaya, Hendri (2011) THE PRODUCTIVITY ANALYZES OF BORED PILE FONDATION IN THE MAIN BRIDGE AREA. In: The 3rd International Conference of European Asian Civil Engineering Forum, 20-22 September 2011, Yogyakarta, Indonesia.
| PDF (EACEF 2011-International Conference) - Published Version Download (312Kb) | Preview |
Abstract
Productivity is an important thing that has to be known in implementing a project. The project is said successfull if the contractor manages to gain maximum profit and the owner obtains satisfactory output, also it on time to accomplish the project. One factor determining the success of a project is productivity. Specifically, the productivity in making foundation of bored pile can be increased by enhancing the resources for supporting it, including the project workers and the tools or equipment used in the project
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TG Bridge engineering |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering Department |
Depositing User: | Sentosa Limanto |
Date Deposited: | 27 Mar 2012 17:26 |
Last Modified: | 27 Mar 2012 17:26 |
URI: | https://repository.petra.ac.id/id/eprint/15343 |
Actions (login required)
View Item |