Logo

THE PRODUCTIVITY ANALYZES OF BORED PILE FONDATION IN THE MAIN BRIDGE AREA

Limanto, Sentosa and Hadi Kusuma, Jonatan and Siswanto, Stephen H. and Wijaya, Hendri (2011) THE PRODUCTIVITY ANALYZES OF BORED PILE FONDATION IN THE MAIN BRIDGE AREA. In: The 3rd International Conference of European Asian Civil Engineering Forum, 20-22 September 2011, Yogyakarta, Indonesia.

[img]
Preview
PDF (EACEF 2011-International Conference) - Published Version
Download (312Kb) | Preview

    Abstract

    Productivity is an important thing that has to be known in implementing a project. The project is said successfull if the contractor manages to gain maximum profit and the owner obtains satisfactory output, also it on time to accomplish the project. One factor determining the success of a project is productivity. Specifically, the productivity in making foundation of bored pile can be increased by enhancing the resources for supporting it, including the project workers and the tools or equipment used in the project

    Item Type: Conference or Workshop Item (Paper)
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    T Technology > TG Bridge engineering
    Divisions: Faculty of Civil Engineering and Planning > Civil Engineering Department
    Depositing User: Sentosa Limanto
    Date Deposited: 27 Mar 2012 17:26
    Last Modified: 27 Mar 2012 17:26
    URI: https://repository.petra.ac.id/id/eprint/15343

    Actions (login required)

    View Item