Beam Column and footings connection of simple prefab housing

Limanto, Sentosa and Johanes Indrojono , Suwono (2015) Beam Column and footings connection of simple prefab housing. Procedia Engineering, 125 (875 K). pp. 838-842. ISSN 1877-7058

[img]
Preview
PDF (Procedia Engineering Vol125, Pgs 838 - 842, (2015)/ ScienceDirect.com) - Submitted Version
Available under License Creative Commons Attribution Non-commercial.

Download (875Kb) | Preview

    Abstract

    Abstract To meet the urgent need for transmigration and to displacements due to natural disasters, prefab housing system is required for fast construction. This study proposed a joint system to connect footings, concrete column / pedestal, and the tie beams. From four types of connections two were deemed appropriate. A prototype, 2 x 2 x 2 m, was built for this purpose and tested for the reliability of the connections. It appears that the connection could resist a horizontal force of 10% the column load and able to withstand a diferential settlement of 2 cm. Erection with simple tools to assemble the components of the prototype only needs less than 6 hours by three laborers. Factory made components will speed up the installation. Keywords:footings, column pedestal, tie beam, connection system, joints, prefab concrete, simple housing Keywords:footings, column pedestal, tie beam, connection system, joints, prefab concrete, simplehousing

    Item Type: Article
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    T Technology > TH Building construction
    Divisions: Faculty of Civil Engineering and Planning > Civil Engineering Department
    Depositing User: Sentosa Limanto
    Date Deposited: 21 Jan 2016 14:23
    Last Modified: 21 Jan 2016 14:23
    URI: https://repository.petra.ac.id/id/eprint/17217