Limanto, Sentosa and Suwono, Johanes Indrojono (2015) Beam column and footings connection of simple prefab housing. Procedia Engineering, 125 (2015). pp. 838-842. ISSN 1877-7058
PDF Download (875Kb) |
Abstract
Abstract To meet the urgent need for transmigration and to displacements due to natural disasters, prefab housing system is required for fast construction. This study proposed a joint system to connect footings, concrete column / pedestal, and the tie beams. From four types of connections two were deemed appropriate. A prototype, 2�2�2 m, was built for this purpose and tested for the reliability of the connections. It appears that the connection could resist a horizontal force of 10% the column load and able to withstand a differential settlement of 2 cm. Erection with simple tools to assemble the components of the prototype only needs less than 6 hours by three laborers. Factory made components will speed up the installation. � 2015 The Authors. Published by Elsevier Ltd. Peer-review under responsibility of organizing committee of The 5th International Conference of Euro Asia Civil Engineering Forum (EACEF-5).
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Keywords:footings; column pedestal; tie beam; connection system; joints; prefab concrete; simple housing. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering Department |
Depositing User: | Admin |
Date Deposited: | 20 Jan 2016 19:35 |
Last Modified: | 22 Jan 2016 19:27 |
URI: | https://repository.petra.ac.id/id/eprint/17224 |
Actions (login required)
View Item |