Logo

Connection System Between Column and Beam for Simple House

Limanto, Sentosa and Suwono, Johanes Indrojono (2014) Connection System Between Column and Beam for Simple House. In: The 2nd International Conference on SCESCM, 23-09-2014 - 25-09-2014, Yogyakarta - Indonesia.

[img] PDF
Download (266Kb)

    Abstract

    Abstract: Precast concrete connections systems have various designs and function of each, and not all of the connections that are required to fulfill the same working criteria. The dimension of building prototype is 2 m x 2 m x 2 m, the function of connections is to unify the elements of construction�s structure to be a monolithic unity, so that can seek the stability of construction�s structure. The use of prefabricated concrete allows good quality control and fast construction method. For the manufacture of small houses this method of constructuon is very promising. The connection system of columns and upper tie beams is always simple connection. To know the reliability of this connection system, the prototype of building frame was build, and a differential settlement applied, with a deflection up to two precentage its length, the tie beam experienced cracks but the connection remained intact and the instalation time of the components are assembled into a single unit structure, is 340 minutes.

    Item Type: Conference or Workshop Item (Paper)
    Additional Information: ISSN: 2406-7350
    Uncontrolled Keywords: Keywords: Building prototype, Connection system, Prefabricated concrete, Simple house
    Subjects: T Technology
    Divisions: Faculty of Civil Engineering and Planning > Civil Engineering Department
    Depositing User: Admin
    Date Deposited: 18 Feb 2015 19:03
    Last Modified: 12 Mar 2015 23:50
    URI: https://repository.petra.ac.id/id/eprint/16997

    Actions (login required)

    View Item