RAHARJO, ALEXANDER ALFREDO SUGIANTO and Halim, Siana (2025) Improving Production Capacity and Coefficient Efficiency of K-Contactor in the Backend Process: A Simulation Case Study. [UNSPECIFIED]
![]() | PDF Download (7Mb) |
![]() | PDF Download (1276Kb) |
Abstract
This research was conducted in an electrical company that aims to increase production capacity due to a surge in demand. The demand is 8% year to year increasing, especially for K-Contactor products. The company also wants to improve the Coefficient Effi-ciency rate towards 80%; currently, it is between 65-75%. A simula-tion model was constructed using Pro-Model to imitate the current condition and to simulate the proposed solution. By arranging the layout of the machine, the target production is increased from 325 to 334 and the coefficient efficiency of K-contactors reaches 80%.
Item Type: | UNSPECIFIED |
---|---|
Uncontrolled Keywords: | Simulation, coefficient efficiency, working sampling, time motion study, facility layout. |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Divisions: | Faculty of Industrial Technology > Industrial Engineering Department |
Depositing User: | Admin |
Date Deposited: | 15 Jan 2025 14:36 |
Last Modified: | 16 Jan 2025 21:44 |
URI: | https://repository.petra.ac.id/id/eprint/21371 |
Actions (login required)
View Item |