Improving Production Capacity and Coefficient Efficiency of K-Contactor in the Backend Process: A Simulation Case Study

RAHARJO, ALEXANDER ALFREDO SUGIANTO and Halim, Siana (2025) Improving Production Capacity and Coefficient Efficiency of K-Contactor in the Backend Process: A Simulation Case Study. [UNSPECIFIED]

[thumbnail of Publikasi1_94032_11278.pdf] PDF
Publikasi1_94032_11278.pdf

Download (7MB)
[thumbnail of Publikasi4_94032_11278.pdf] PDF
Publikasi4_94032_11278.pdf

Download (1MB)
Official URL: https://www.icico.info/

Abstract

This research was conducted in an electrical company that aims to increase production capacity due to a surge in demand. The demand is 8% year to year increasing, especially for K-Contactor products. The company also wants to improve the Coefficient Effi-ciency rate towards 80%; currently, it is between 65-75%. A simula-tion model was constructed using Pro-Model to imitate the current condition and to simulate the proposed solution. By arranging the layout of the machine, the target production is increased from 325 to 334 and the coefficient efficiency of K-contactors reaches 80%.

Item Type: UNSPECIFIED
Uncontrolled Keywords: Simulation, coefficient efficiency, working sampling, time motion study, facility layout.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Industrial Technology > Industrial Engineering Department
Depositing User: Admin
Date Deposited: 15 Jan 2025 07:36
Last Modified: 16 Jan 2025 14:44
URI: https://repository.petra.ac.id/id/eprint/21371

Actions (login required)

View Item
View Item